Friday, June 14, 2013

Bosley Top to Etruria

Locks 13 Miles 14.8 1 long Tunnel

I have worn two hats today one to keep off the rain and one to keep off the sun. The day startedwith some sunshine to see us down Bosley locks. Every lock was already full and locks 8,9,10 & 12 even had their gates open. It made me feel quite guilty using 12 locksworth of water to make our descent, no-one coming up to take ovr the empties either. Harecastle tunnel was similar straight in as no one was waiting at either end, took 35 mins to get through.

Thursday 13 June 2013
High Lane to Bosley Top
Locks 0 Miles 12.3 1 Swing Bridge

At least we set off in the dry. The forecast all week was for rain on Thursday and this was the week they got it right. We got as far as Whiteley Green before the rain started and it was a downpour all the way through Bollington. As all the photos from my previous years blogs appear to be lost in PICASA I was hoping to get plenty of up-to-date photographs of local places as well as some from further afield without repeating what I had done in earlier blog postings. At the moment the rain has kept the camera inside.

No comments:

avandia class action