Our journey to Cogenhoe was interrupted at Wellingbouough for a visit to Tesco to top op vital supplies and get some food. The sections of the Nene on the approaches to the locks both upstream and downstream are very weedy. Thankfully the sections where there is a full flow of the river are in the main clear. The section of the river from Welllingborough to Irthlingborough seem to be a trial ground by EA for Lock Design. Three are Mitre gates top and bottom one of which has both paddles on the same side alongside each other, the other (Ditchford) has a horizontal radial gate. After Wellingborough the locks return to the Mitre gates at the top and a guillotine at the bottom.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment