Saturday, May 29, 2010

High Lane to Chatterley


Two days report as there was no connection last night
28/05/2010 Miles 13.7 locks 0
A nice run in the sun from High Lane to Bosley. Didn't start untill after 12 noon as we waited in vain for the pump-out cards to arrive. at least the weather was kind to us. The picture is of the Mill at Bollington with the new bridge at the front.
29/05/2010
Miles 12 locks 13 and one long Tunnel
What a contrast in the weather, the driest we have been today was when we were in the Harecastle Tunnel. So no pictures today. We are moored at the southern end of the tunnel at Chatterley.

No comments:

avandia class action