From the following sequence of pictures you can see Green Lane Aqueduct on the Lower Peak Forest Canal in Romiley after repair work to fix a serious leak. As you may recall two separate attempts were made or the second visit was planned as the pointing of the wall where the most water was coming through was not done until after the first visit. There is still a small "weep" in the arch of the aqueduct
Wednesday, April 28, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment